Difference between revisions of "Manta class Small Merchant/meta"
Jump to navigation
Jump to search
| Line 1: | Line 1: | ||
| + | == High Guard design == | ||
| + | <pre> | ||
| + | USP | ||
| + | AF-24212R1-000000-00000-0 MCr 88.700 200 Tons | ||
| + | Bat Bear Crew: 3 | ||
| + | Bat TL: 11 | ||
| − | + | Cargo: 63 Crew Sections: 1 of 3 Fuel: 44 EP: 4 Agility: 1 | |
| − | + | Craft: 1 x 4T Air/Raft | |
| + | Fuel Treatment: Fuel Scoops | ||
| + | |||
| + | Architects Fee: MCr 0.887 Cost in Quantity: MCr 70.960 | ||
| + | </pre> | ||
| + | ; HULL: 200.000 tons standard, 2,800.000 cubic meters, Close Structure Configuration | ||
| + | ;CREW: Pilot, Engineer, Medic | ||
| + | ;ENGINEERING: Jump-2, 1G Manuever, Power plant-2, 4.000 EP, Agility 1 | ||
| + | ;AVIONICS> Bridge, Model/1bis Computer | ||
| + | :HARDPOINTS: 2 Hardpoints | ||
| + | ;CRAFT: 1 4.000 ton Air/Raft (Crew of 0, Cost of MCr 0.000) | ||
| + | ; FUEL: 44 Tons Fuel (2 parsecs jump and 28 days endurance). On Board Fuel Scoops, No Fuel Purification Plant | ||
| + | ; MISCELLANEOUS: 11 Staterooms, 63 Tons Cargo | ||
| + | ;COST: MCr 89.587 Singly (incl. Architects fees of MCr 0.887), MCr 70.960 in Quantity | ||
| + | ; CONSTRUCTION TIME: 57 Weeks Singly, 46 Weeks in Quantity | ||
Latest revision as of 18:44, 29 May 2022
High Guard design[edit]
USP
AF-24212R1-000000-00000-0 MCr 88.700 200 Tons
Bat Bear Crew: 3
Bat TL: 11
Cargo: 63 Crew Sections: 1 of 3 Fuel: 44 EP: 4 Agility: 1
Craft: 1 x 4T Air/Raft
Fuel Treatment: Fuel Scoops
Architects Fee: MCr 0.887 Cost in Quantity: MCr 70.960
- HULL
- 200.000 tons standard, 2,800.000 cubic meters, Close Structure Configuration
- CREW
- Pilot, Engineer, Medic
- ENGINEERING
- Jump-2, 1G Manuever, Power plant-2, 4.000 EP, Agility 1
- AVIONICS> Bridge, Model/1bis Computer
- HARDPOINTS: 2 Hardpoints
- CRAFT
- 1 4.000 ton Air/Raft (Crew of 0, Cost of MCr 0.000)
- FUEL
- 44 Tons Fuel (2 parsecs jump and 28 days endurance). On Board Fuel Scoops, No Fuel Purification Plant
- MISCELLANEOUS
- 11 Staterooms, 63 Tons Cargo
- COST
- MCr 89.587 Singly (incl. Architects fees of MCr 0.887), MCr 70.960 in Quantity
- CONSTRUCTION TIME
- 57 Weeks Singly, 46 Weeks in Quantity