Editing Besouro Valente class Personnel Transport
Jump to navigation
Jump to search
Warning: You are not logged in. Your IP address will be publicly visible if you make any edits. If you log in or create an account, your edits will be attributed to your username, along with other benefits.
The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 94: | Line 94: | ||
| 1. | | 1. | ||
| [[Ton|Tonnage]] | | [[Ton|Tonnage]] | ||
− | | The Personnel Transport is constructed using a 12,000 [[Ton]] [[hull]] built in a generally [[Cone Hull| | + | | The Personnel Transport is constructed using a 12,000 [[Ton]] [[hull]] built in a generally [[Cone Hull|Conical]] configuration. The hull is fully [[Streamlined Hull|streamlined]], giving fair [[Atmosphere|atmospheric]] performance that is further enhanced by its onboard [[Gravity Control Technology|gravitic]] systems. |
* Individual sections of the ship are divided by [[Bulkhead Wall|bulkhead wall]]s. | * Individual sections of the ship are divided by [[Bulkhead Wall|bulkhead wall]]s. | ||
* There are multiple [[airlock]]s located around the vessel. The [[cargo hold]] is accessed by large doors and has loading ramps. | * There are multiple [[airlock]]s located around the vessel. The [[cargo hold]] is accessed by large doors and has loading ramps. |